Shek Wu Hui Effluent Polishing Plant Project Captures Green Certifications

03 Aug 2021

Shek Wu Hui Effluent Polishing Plant Project Captures Green Certifications

Filed under: Ebook — jec_editor @ 3:34 am

JEC has put green project management into practice at its Shek Wu Hui Effluent Polishing Plant (Main Works Stage 1) project. Adhering to 5Rs concept (Reduce, Reuse, Recycle, Repair and Rethink), the project team implemented several upcycling initiatives such as turn coffee capsule into accessories, make fallen trees into table and phone stand, and reuse expired safety helmet as flowerpots to give the waste materials a second life. Their green effort has been recognized in the Energywi$e Certificate by Hong Kong Green Organisation Certification.

10 Jun 2021

Chief Executive Kevin O’Brien Speaks at BEC EnviroSeries Conference

Filed under: Ebook — jec_editor @ 11:42 am

On 4 June 2021, Chief Executive Kevin O’Brien took part in Hong Kong Business Environment Council’s Enviroseries Conference “Redefining Business Leadership for Green Growth”. 

 

Click to see the video of the Keynote Session and Panel Discussion.

 

Other speakers featured in this session included Peter Bakker, President & CEO, World Business Council for Sustainable Development (WBCSD) and T.K. Chiang, Managing Director, CLP Power Hong Kong. Read more about WBCSD’s Vision 2050 here.

26 May 2021

Notice of Change in Chief Executive

Filed under: Ebook — jec_editor @ 11:41 am

(Hong Kong, 26th May 2021) The Jardine Engineering Corporation Limited (“JEC”) today announces the following management change:

Kevin O’Brien, currently Chief Executive of JEC, will be moving at the end of August 2021 to succeed Thomas Ho as Chief Executive of Gammon Construction. Thomas will be retiring on 12th October 2021. In turn, Noky Wong, currently Deputy Chief Executive of Jardine Schindler Group (“JSG”), will succeed Kevin at JEC.

Kevin will commence his new role at Gammon, initially as Chief Executive (Designate), on 1st September. Kevin joined Balfour Beatty in Hong Kong in 1996 and moved to Gammon, a 50/50 joint venture between Balfour Beatty and Jardine Matheson, in 2004 where he held a number of senior roles. He was appointed Chief Executive of JEC in 2018.

Noky will start his new role as Chief Executive (Designate) of JEC on 1st July. He joined JSG in July 2003 and has since held a number of leadership roles in Hong Kong, Vietnam and Malaysia before being appointed Deputy Chief Executive of JSG in January 2020.

20 Apr 2021

JEC Joins BEC Low Carbon Charter Power Up Coalition

Filed under: Ebook — jec_editor @ 2:35 am

JEC signed up as a member of the Power Up Coalition, a new initiative under the Low Carbon Charter launched by Business Environment Council (BEC).  JEC aspires to support early electrification of construction sites in non-public works project and promote zero-emission construction sites in Hong Kong in order to achieve the city’s long-term decarbonisation goal.

02 Apr 2021

TKO Desalination Plant Project Receives Industry Recognitions

Filed under: Ebook — jec_editor @ 2:52 am

JEC’s key environmental project Tseung Kwan O Desalination Plant (First Stage) has recently won the Silver Award (Government Projects Category) at the HKIBIM Award 2020 in recognition of our efforts in promoting the use of BIM. It also received the Energywi$e Cerificate and Wastewi$e Certificate (both at excellent level) from the Environmental Campaign Committee.

JEC Apprentice Named 2020 Outstanding Apprentice

Filed under: Ebook — jec_editor @ 2:28 am

JEC Craft Apprentice from Maintenance & Renovation Security System team Tsoi Chak Kiu was bestowed the 2020 Outstanding Apprentices Award by Hong Kong Vocational Training Council. He joined JEC in 2018 and has earned the award with his outstanding achievement and dedication.

25 Mar 2021

JEC Recognises as 15 Years+ Caring Company

Filed under: Ebook — jec_editor @ 2:20 am

JEC was awarded with the 15 Years Plus Caring Company logo by the Hong Kong Council of Social Service in recognition of its commitment in community services. JEC has been involved in community services for children and the elderly since the establishment of Caring Team in 2006.

02 Mar 2021

JEC Showcases Experience at DfMA MiMEP Tradeshow 2021

Filed under: Ebook — jec_editor @ 2:44 am

From 2 to 12 March, JEC took part in the DfMA MiMEP Tradeshow 2021 jointly organised by the Construction Industry Council (CIC) and the Hong Kong Federation of Electrical and Mechanical Contractors (HKFEMC), using Tseung Kwan O Desalination Plant Project as a latest showcase of JEC’s DfMA application.

20 Jul 2020

JEC Takes Part in Tseung Kwan O Desalination Plant Stage I Project

Filed under: Ebook — jec_editor @ 11:40 am

JEC with its joint venture partners was recently awarded the contract from the Water Supplies Department to design, build and operate the first stage of Tseung Kwan O Desalination Plant.

Building on a 8-hectare site, the first stage of construction targets a water production capacity at 135,000m3 per day with provision for future expansion to the ultimate water production capacity up to 270,000m3 per day and associated facilities. The product water will be transferred via a fresh water main to the existing Tseung Kwan O Fresh Water Primary Service Reservoir.

The desalination plant will adopt reverse osmosis technology to produce potable water complying with the Hong Kong Drinking Water Standards under local conditions. It is expected to commence operation in 2023, providing the city with a strategic water resource which is not susceptible to the impact of climate change.

02 Jul 2020

Trane Hong Kong Honoured with Green Building Award 2019

Filed under: Ebook — jec_editor @ 11:40 am

JEC’s joint venture partner Trane Hong Kong has been awarded the Grand Award in the Building Products & Technologies Category at Green Building Award 2019 by the Professional Green Building Council and the Hong Kong Green Building Council for its new Trane CenTraVacTM Chillers @R514A.

Equipped with the latest low-pressure refrigerant R514A, this flagship model has been adopted by large-scale government projects such as Queensway Government Office, for its promising performance that effectively fulfils the environmental goals of Hong Kong 2030+.

Bangkok MRT Orange Line East Section Contract

Filed under: Ebook — jec_editor @ 11:39 am

JEC Thailand was awarded a contract to supply, install, test and commission environmental control system, plumbing & drainage system, fire services system and electrical system for Bangkok MRT Orange Line East Section. The scope of work covers 2 underground stations (Lam Sali and Sri Burapha) along the line and 3 intervention shafts. It is expected to be completed by October 2022.

JEC Apprentice Named 2019 Outstanding Apprentice

Filed under: Ebook — jec_editor @ 11:38 am

Chan Kar Hei, Air-conditioning Craft Apprentice from Maintenance & Renovation team was bestowed the 2019 Outstanding Apprentices Award by Hong Kong Vocational Training Council after the two-year programme.

“I am very thankful for the opportunities the company and colleagues have given me. The programme has deepened my knowledge and practical skills in the field. I love my job even more now and I will seek continuous improvement through ongoing learning.” said Kar Hei. 

Bangkok ICS Tower Project

Filed under: Ebook — jec_editor @ 11:38 am

JEC Thailand secured the contract for supply, installation, testing and commissioning of sanitary & fire protection system and air conditioning & ventilation system at the ICS Tower by the Chao Phraya River, Bangkok.

Opposite to the landmark shopping mall ICONSIAM with a total area of 8,800 sqm, the project is a mixed-use development that includes a 11-storey office building with shopping mall as well as a 29-storey Hilton Garden Inn hotel.

08 Feb 2020

JEC Takes Part in Upgrading Shek Wu Hui Sewage Treatment Works

Filed under: Ebook — jec_editor @ 11:37 am

JEC Hong Kong was recently awarded a contract from Drainage Services Department for the Main Works Stage 1 of Shek Wu Hui Effluent Polishing Plant. Operating for more than 30 years, the project aims to increase the treatment capacity which is approaching its maximum design capacity of 93,000m3/day with modern technologies.

The works include installation works and testing and commissioning of the electrical and mechanical sludge treatment facilities (including sludge dewatering building, combined heat and power building, sludge digesters, biogas holding tanks etc.); ultraviolet system and associated pumping station and the associated systems. To enhance its environmental performance, JEC will also be the first to install thermal hydrolysis pre-treatment system and sidestream treatment facilities in Hong Kong.

The improvement scheme of Stage 1 will increase the treatment capacity by 35,000m3/day, and eventually increase to 190,000m3/day upon completion of all stages. The project has commenced in late October and is expected to be completed in 2024.

02 Jan 2020

Power Upgrade for Bumrungrad International Hospital

Filed under: Ebook — jec_editor @ 11:36 am

JEC Thailand secured a contract to upgrade the generator room in Bumrungrad International Hospital in Bangkok, the first non-US hospital to earn an Excellence designation from the Global Healthcare Accreditation (GHA) Program. The project team will supply and install 2 new generator sets to increase current power capacity from 2,000 kVA to 2,500 kVA and replace the existing transformer. The project is expected to be completed in May 2020.

Krungsri Rama III Tower Project

Filed under: Ebook — jec_editor @ 11:36 am

JEC Thailand secured a contract to supply, install, test and commission sanitary & fire protection system, electrical & communication system, and air conditioning & ventilation system at Krungsri Rama III Tower, the headquarters of Bank of Ayudhya in Bangkok.

Located on Rama III Road with a total area of 82,000 sqm, the 22-stoery tower comprises of 2 basements, auditorium, learning centre, as well as a pavilion in Thai style. The project is expected to be completed in February 2022.

District Cooling System Customer Station Works

Filed under: Ebook — jec_editor @ 11:35 am

JEC Singapore has secured a contract for supply, installing and commissioning of the district cooling system (DCS) customer station works for Razer Inc, a global computer gaming hardware company. The project connects the interface between DCS and the cooling system of the 7-storey integrated office building of Razer Inc at One-North Development. The works include a range of facilities including plate heat exchanger, building management system and interfacing cable. The project is expected to be completed in 2020.

Trane Hong Kong Honoured with The Association of Energy Engineers Award 2019

Filed under: Ebook — jec_editor @ 11:34 am

JEC’s joint venture partner Trane Hong Kong (TYS) was awarded the Innovative Energy Project of the Year Award for the Asia-Pacific Region by the Association of Energy Engineers® in September. An advocate of the Government’s climate action plan, TYS pioneered in adopting the leading green technology from the US in its new generation chiller, coupled with energy-saving refrigerant and energy simulation software that achieves superior performance in energy efficiency. The remarkable energy saving and carbon emission reduction by the chiller have been well proven in buildings such as hospitals, clubhouses, commercial buildings and institute complexes, saving up to 2,837 MWh per year which represents the reduction of 1,986,500 kg CO2/ year (equivalent to planting 86,370 trees).

05 Sep 2019

JEC Awarded Organic Resources Recovery Centre Phase 2 (O·PARK2) Project

Filed under: Ebook — jec_editor @ 11:33 am

JEC with its joint venture partners was recently awarded the contract from Environmental Protection Department to design, build and operate the Organic Resources Recovery Centre Phase 2 (O·PARK2).

O·PARK2 will locate at Sha Ling in North District and will be able to treat 300 tonnes of food waste daily and produce biogas. In addition to providing electricity and heat for the facilities in O·PARK2, the surplus biogas will be used for production of town gas or electricity to be fed into the power grids of the power companies. Furthermore, O·PARK2 will produce about 10,000 tonnes of compost annually, of which some will be reserved for use by government departments, farmers and members of the public for free.

With the commissioning of O·PARK2 in 2022, the decrease in use of fossil fuels for electricity generation together with the reduced amount of organic waste being sent to landfills will prevent the emission of some 67,000 tonnes of greenhouse gases, and reduce the amount of food waste to be disposed of at landfills by about 110,000 tonnes annually.

09 Jul 2019

Provision of E&M System for Sha Tau Kok Temporary Sewage Treatment Plant

Filed under: Ebook — jec_editor @ 11:32 am

JEC Hong Kong secured the contract to design and install E&M systems for the Temporary Sewage Treatment Plant at Sha Tau Kok. This is part of the works for Expansion of Sha Tau Kok Sewage Treatment Works Phase 1.

To tackle the challenges on short construction period and small site footprint, the project team adopts Moving Bed Biofilm Reactor (MBBR) technology in the project. MBBR is an advanced wastewater treatment technology using specialised plastic carriers to create a surface on which microorganisms treating the wastewater are grown. It is renowned for its compactness and high treatment efficiency.

Besides, Modular Integrated Construction (MiC) technology is used during the construction of steel processing tanks in the plant. Integrated modules of steel tank are manufactured in the factory before transporting to site for installation, substantially reducing the adverse impacts of weather conditions, labour resources and site constraints, in turn significantly improves construction efficiency and site safety.

The project has commenced in March this year and is expected to be completed in May 2020. The plant will have a treatment capacity of 2,500 m3/day and become the largest MBBR plant in Hong Kong upon its completion.

« Newer PostsOlder Posts »